Saturday, February 04, 2006

we now have ductwork, electrical/wiring, and a fireplace

this week was the installation the electrical wiring and surround sound pre-wiring. the living room downstairs and the game room upstairs received the surround sound pre-wire. air conditioning ductwork has also been installed throughout the house. locations of lighting fixtures have also been installed. the master bathroom now has the bathtub as well as the shower base. the fireplace has also been installed in the living room. brick has also been delivered and should go up in the few weeks.












0 Comments:

Post a Comment

<< Home