breaking ground
12.31.05 - doesn't look like alot, but breaking ground is a good feeling. on our first visit, the frame for the slab was put together and everything was being prepared for the pour. we snapped a couple of pics and walked around a little.
01.07.06 - the following week we came back expecting the slab to have been poured, but that was not the case. the addition of the cables and moisture barrier were added since our first visit.
below are the pics form our first two visits.....